Completed works on laser scanning

Hotel «Premier Hotel Dnister»

Task:

Creating a 3D model of the entrance to the underground parking of the hotel for obtaining dimensional drawings (for the design of a glass canopy) using laser 3D scanning.

Object Complexity:

The irregular shape of the building (spiral) and too large an area for manual measurements.

Implementation Deadlines:

  • Fieldwork – 1 day
  • Post-processing of data – 1 day

Hotel «IBIS»

Task:

Creating a BIM model of the hotel building for obtaining dimensional drawings (for reconstruction and expansion) using laser 3D scanning.

Object Complexity:

Complexity of geometric shapes of facades, large area of the object, and inaccessibility of some elements for measurement.

Implementation Deadlines:

  • Fieldwork – 1 day
  • Data post-processing – 2 days

McDonald's

Task

Creating a BIM model of the object to obtain dimensional drawings (for equipment design and internal system retrofitting) using laser 3D scanning.

Object Complexity

Large amount of equipment for manual measurements.

Implementation Deadlines:

  • Fieldwork – 1 day
  • Data post-processing – 2 days

Lviv Theatre of Opera and Ballet

Task

Creating a BIM model of the object to obtain dimensional drawings (for the development of restoration projects, creation of decorations, and light shows on the building facade) using laser 3D scanning.

Object Complexity

Large number of decorative elements and height.

Implementation Deadlines:

  • Fieldwork – 1 day
  • Data post-processing – 1 day

Arch of the Palace of Sports 'Ukraine'

Task

Creating a BIM model of the arch to obtain its dimensional drawings (for reconstruction) using laser 3D scanning.

Object Complexity

Complex geometry of individual elements and height.

Implementation Deadlines:

  • Fieldwork – 1 day
  • Data post-processing – 5 days

Lviv Organ Hall

Task

Creating a BIM model of the object to obtain dimensional drawings (for internal restoration, namely installing thermal curtains) using laser 3D scanning.

Object Complexity

Large number of decorative elements and height.

Implementation Deadlines:

  • Fieldwork – 1 day
  • Data post-processing – 1 day

Residential Complex 'Happy PLATINUM'

Task

Creating a BIM model of the object to obtain dimensional drawings (for calculating the area of the building’s 3 facades) using laser 3D scanning.

Object Complexity

Height of the structure (22 floors – approximately 60 m).

Implementation Deadlines:

  • Fieldwork – 1 day
  • Data post-processing – 7 days

Facade of 21 Svobodi Avenue

Task

Creating a BIM model of the object to obtain dimensional drawings (for reconstruction) using laser 3D scanning.

Object Complexity

Part of the object (inner courtyard) that was scanned is in a state of disrepair.

Implementation Deadlines:

  • Fieldwork – 1 day
  • Data post-processing – 1 day

Kulparkiv bridge

Task

Creating a BIM model of the object to obtain dimensional drawings (for bridge reconstruction) using laser 3D scanning.

Object Complexity

Height and the dilapidated condition of the scanned section of the bridge.

Implementation Deadlines:

  • Fieldwork – 1 day
  • Data post-processing – 4 days

Insulator Factory

Task

Creating a BIM model of the object to obtain dimensional drawings (for reconstruction) using laser 3D scanning.

Object Complexity

High temperature inside the building and a large number of internal engineering systems.

Implementation Deadlines:

  • Fieldwork – 4 days
  • Data post-processing – 4 days

Transformer Substation

Task

Creating a BIM model of the object to obtain dimensional drawings (for reconstruction) using laser 3D scanning.

Object Complexity

The scanned part of the object is in a state of disrepair and under voltage.

Implementation Deadlines:

  • Fieldwork – 0.5 day
  • Data post-processing – 1 day

Coke battery

Task

Creating a BIM model of the object to obtain dimensional drawings (for reconstruction) using laser 3D scanning.

Object Complexity

Measurements inside are impossible to take manually due to high temperature (over 1000 degrees Celsius).

Implementation Deadlines:

  • Fieldwork – 1 day
  • Data post-processing – 3 days

Facades in the city of Kryvyi Rih

Task

Creating a BIM model of the facades on Postova Street to obtain their dimensional drawings (for installing decorative lighting) using laser 3D scanning.

Object Complexity

Large number of decorative elements and height.

Implementation Deadlines:

  • Fieldwork – 1 day
  • Data post-processing – 5 days

Tannery, Lviv, Promyslova Street, 53

Task

Creating a BIM model of the object to obtain dimensional drawings (for reconstruction) using laser 3D scanning.

Object Complexity

The smell, which complicates the work process.

Implementation Deadlines:

  • Fieldwork – 12 days
  • Data post-processing – 10 days

Ivano-Frankivsk Cement Plant

Task

Creating a BIM model of the object to obtain dimensional drawings (for reconstruction) using laser 3D scanning.

Object Complexity

Significant height and density of pipelines and utilities.

Implementation Deadlines:

  • Fieldwork – 1 day

Kryzhopil Sugar Plant

Task

Creating a BIM model of the object to obtain dimensional drawings (for reconstruction) using laser 3D scanning.

Object Complexity

Lots of technological equipment, technical rooms with reservoirs, and utilities.

Implementation Deadlines:

  • Fieldwork – 20 days
  • Data post-processing – 20 days

Haisyn Sugar Plant

Task

Creating a BIM model of the object to obtain dimensional drawings (for reconstruction) using laser 3D scanning.

Object Complexity

Lots of technological equipment, technical rooms with reservoirs, and utilities.

Implementation Deadlines:

  • Fieldwork – 21 days
  • Data post-processing – 22 days

"Svyato-Voskresensky Novo-Athos Monastery on Pekarska Street, 59A, in Lviv"

Task

Creating a BIM model of the object to obtain dimensional drawings (for reconstruction) using laser 3D scanning.

Object Complexity

Lots of vegetation, requiring multiple stations to be set up.

Implementation Deadlines:

  • Fieldwork – 21 days
  • Data post-processing – 22 days

330 kV Substation in Novovolynsk

Task

Creating a BIM model of the object to obtain dimensional drawings (for reconstruction) using laser 3D scanning.