Completed works on laser scanning
Hotel «Premier Hotel Dnister»
Task:
Creating a 3D model of the entrance to the underground parking of the hotel for obtaining dimensional drawings (for the design of a glass canopy) using laser 3D scanning.
Object Complexity:
The irregular shape of the building (spiral) and too large an area for manual measurements.
Implementation Deadlines:
- Fieldwork – 1 day
- Post-processing of data – 1 day
Hotel «IBIS»
Task:
Creating a BIM model of the hotel building for obtaining dimensional drawings (for reconstruction and expansion) using laser 3D scanning.
Object Complexity:
Complexity of geometric shapes of facades, large area of the object, and inaccessibility of some elements for measurement.
Implementation Deadlines:
- Fieldwork – 1 day
- Data post-processing – 2 days
McDonald's
Task
Creating a BIM model of the object to obtain dimensional drawings (for equipment design and internal system retrofitting) using laser 3D scanning.
Object Complexity
Large amount of equipment for manual measurements.
Implementation Deadlines:
- Fieldwork – 1 day
- Data post-processing – 2 days
Lviv Theatre of Opera and Ballet
Task
Creating a BIM model of the object to obtain dimensional drawings (for the development of restoration projects, creation of decorations, and light shows on the building facade) using laser 3D scanning.
Object Complexity
Large number of decorative elements and height.
Implementation Deadlines:
- Fieldwork – 1 day
- Data post-processing – 1 day
Arch of the Palace of Sports 'Ukraine'
Task
Creating a BIM model of the arch to obtain its dimensional drawings (for reconstruction) using laser 3D scanning.
Object Complexity
Complex geometry of individual elements and height.
Implementation Deadlines:
- Fieldwork – 1 day
- Data post-processing – 5 days
Lviv Organ Hall
Task
Creating a BIM model of the object to obtain dimensional drawings (for internal restoration, namely installing thermal curtains) using laser 3D scanning.
Object Complexity
Large number of decorative elements and height.
Implementation Deadlines:
- Fieldwork – 1 day
- Data post-processing – 1 day
Residential Complex 'Happy PLATINUM'
Task
Creating a BIM model of the object to obtain dimensional drawings (for calculating the area of the building’s 3 facades) using laser 3D scanning.
Object Complexity
Height of the structure (22 floors – approximately 60 m).
Implementation Deadlines:
- Fieldwork – 1 day
- Data post-processing – 7 days
Facade of 21 Svobodi Avenue
Task
Creating a BIM model of the object to obtain dimensional drawings (for reconstruction) using laser 3D scanning.
Object Complexity
Part of the object (inner courtyard) that was scanned is in a state of disrepair.
Implementation Deadlines:
- Fieldwork – 1 day
- Data post-processing – 1 day
Kulparkiv bridge
Task
Creating a BIM model of the object to obtain dimensional drawings (for bridge reconstruction) using laser 3D scanning.
Object Complexity
Height and the dilapidated condition of the scanned section of the bridge.
Implementation Deadlines:
- Fieldwork – 1 day
- Data post-processing – 4 days
Insulator Factory
Task
Creating a BIM model of the object to obtain dimensional drawings (for reconstruction) using laser 3D scanning.
Object Complexity
High temperature inside the building and a large number of internal engineering systems.
Implementation Deadlines:
- Fieldwork – 4 days
- Data post-processing – 4 days
Transformer Substation
Task
Creating a BIM model of the object to obtain dimensional drawings (for reconstruction) using laser 3D scanning.
Object Complexity
The scanned part of the object is in a state of disrepair and under voltage.
Implementation Deadlines:
- Fieldwork – 0.5 day
- Data post-processing – 1 day
Coke battery
Task
Creating a BIM model of the object to obtain dimensional drawings (for reconstruction) using laser 3D scanning.
Object Complexity
Measurements inside are impossible to take manually due to high temperature (over 1000 degrees Celsius).
Implementation Deadlines:
- Fieldwork – 1 day
- Data post-processing – 3 days
Facades in the city of Kryvyi Rih
Task
Creating a BIM model of the facades on Postova Street to obtain their dimensional drawings (for installing decorative lighting) using laser 3D scanning.
Object Complexity
Large number of decorative elements and height.
Implementation Deadlines:
- Fieldwork – 1 day
- Data post-processing – 5 days
Tannery, Lviv, Promyslova Street, 53
Task
Creating a BIM model of the object to obtain dimensional drawings (for reconstruction) using laser 3D scanning.
Object Complexity
The smell, which complicates the work process.
Implementation Deadlines:
- Fieldwork – 12 days
- Data post-processing – 10 days
Ivano-Frankivsk Cement Plant
Task
Creating a BIM model of the object to obtain dimensional drawings (for reconstruction) using laser 3D scanning.
Object Complexity
Significant height and density of pipelines and utilities.
Implementation Deadlines:
- Fieldwork – 1 day
Kryzhopil Sugar Plant
Task
Creating a BIM model of the object to obtain dimensional drawings (for reconstruction) using laser 3D scanning.
Object Complexity
Lots of technological equipment, technical rooms with reservoirs, and utilities.
Implementation Deadlines:
- Fieldwork – 20 days
- Data post-processing – 20 days
Haisyn Sugar Plant
Task
Creating a BIM model of the object to obtain dimensional drawings (for reconstruction) using laser 3D scanning.
Object Complexity
Lots of technological equipment, technical rooms with reservoirs, and utilities.
Implementation Deadlines:
- Fieldwork – 21 days
- Data post-processing – 22 days
"Svyato-Voskresensky Novo-Athos Monastery on Pekarska Street, 59A, in Lviv"
Task
Creating a BIM model of the object to obtain dimensional drawings (for reconstruction) using laser 3D scanning.
Object Complexity
Lots of vegetation, requiring multiple stations to be set up.
Implementation Deadlines:
- Fieldwork – 21 days
- Data post-processing – 22 days
330 kV Substation in Novovolynsk
Task
Creating a BIM model of the object to obtain dimensional drawings (for reconstruction) using laser 3D scanning.