Completed Projects
Hotel «Premier Hotel Dnister»
Task:
Creating a 3D model of the entrance to the underground parking of the hotel for obtaining dimensional drawings (for the design of a glass canopy) using laser 3D scanning.
Object Complexity:
The irregular shape of the building (spiral) and too large an area for manual measurements.
Implementation Deadlines:
- Fieldwork – 1 day
- Post-processing of data – 1 day
Hotel «IBIS»
Task:
Creating a BIM model of the hotel building for obtaining dimensional drawings (for reconstruction and expansion) using laser 3D scanning.
Object Complexity:
Complexity of geometric shapes of facades, large area of the object, and inaccessibility of some elements for measurement.
Implementation Deadlines:
- Fieldwork – 1 day
- Data post-processing – 2 days
McDonald's
Task
Creating a BIM model of the object to obtain dimensional drawings (for equipment design and internal system retrofitting) using laser 3D scanning.
Object Complexity
Large amount of equipment for manual measurements.
Implementation Deadlines:
- Fieldwork – 1 day
- Data post-processing – 2 days
Lviv Theatre of Opera and Ballet
Task
Creating a BIM model of the object to obtain dimensional drawings (for the development of restoration projects, creation of decorations, and light shows on the building facade) using laser 3D scanning.
Object Complexity
Large number of decorative elements and height.
Implementation Deadlines:
- Fieldwork – 1 day
- Data post-processing – 1 day
Arch of the Palace of Sports 'Ukraine'
Task
Creating a BIM model of the arch to obtain its dimensional drawings (for reconstruction) using laser 3D scanning.
Object Complexity
Complex geometry of individual elements and height.
Implementation Deadlines:
- Fieldwork – 1 day
- Data post-processing – 5 days
Lviv Organ Hall
Task
Creating a BIM model of the object to obtain dimensional drawings (for internal restoration, namely installing thermal curtains) using laser 3D scanning.
Object Complexity
Large number of decorative elements and height.
Implementation Deadlines:
- Fieldwork – 1 day
- Data post-processing – 1 day
Residential Complex 'Happy PLATINUM'
Task
Creating a BIM model of the object to obtain dimensional drawings (for calculating the area of the building’s 3 facades) using laser 3D scanning.
Object Complexity
Height of the structure (22 floors – approximately 60 m).
Implementation Deadlines:
- Fieldwork – 1 day
- Data post-processing – 7 days
Facade of 21 Svobodi Avenue
Task
Creating a BIM model of the object to obtain dimensional drawings (for reconstruction) using laser 3D scanning.
Object Complexity
Part of the object (inner courtyard) that was scanned is in a state of disrepair.
Implementation Deadlines:
- Fieldwork – 1 day
- Data post-processing – 1 day
Kulparkiv bridge
Task
Creating a BIM model of the object to obtain dimensional drawings (for bridge reconstruction) using laser 3D scanning.
Object Complexity
Height and the dilapidated condition of the scanned section of the bridge.
Implementation Deadlines:
- Fieldwork – 1 day
- Data post-processing – 4 days
Insulator Factory
Task
Creating a BIM model of the object to obtain dimensional drawings (for reconstruction) using laser 3D scanning.
Object Complexity
High temperature inside the building and a large number of internal engineering systems.
Implementation Deadlines:
- Fieldwork – 4 days
- Data post-processing – 4 days
Transformer Substation
Task
Creating a BIM model of the object to obtain dimensional drawings (for reconstruction) using laser 3D scanning.
Object Complexity
The scanned part of the object is in a state of disrepair and under voltage.
Implementation Deadlines:
- Fieldwork – 0.5 day
- Data post-processing – 1 day
Coke battery
Task
Creating a BIM model of the object to obtain dimensional drawings (for reconstruction) using laser 3D scanning.
Object Complexity
Measurements inside are impossible to take manually due to high temperature (over 1000 degrees Celsius).
Implementation Deadlines:
- Fieldwork – 1 day
- Data post-processing – 3 days
Facades in the city of Kryvyi Rih
Task
Creating a BIM model of the facades on Postova Street to obtain their dimensional drawings (for installing decorative lighting) using laser 3D scanning.
Object Complexity
Large number of decorative elements and height.
Implementation Deadlines:
- Fieldwork – 1 day
- Data post-processing – 5 days
Tannery, Lviv, Promyslova Street, 53
Task
Creating a BIM model of the object to obtain dimensional drawings (for reconstruction) using laser 3D scanning.
Object Complexity
The smell, which complicates the work process.
Implementation Deadlines:
- Fieldwork – 12 days
- Data post-processing – 10 days
Ivano-Frankivsk Cement Plant
Task
Creating a BIM model of the object to obtain dimensional drawings (for reconstruction) using laser 3D scanning.
Object Complexity
Significant height and density of pipelines and utilities.
Implementation Deadlines:
- Fieldwork – 1 day
Kryzhopil Sugar Plant
Task
Creating a BIM model of the object to obtain dimensional drawings (for reconstruction) using laser 3D scanning.
Object Complexity
Lots of technological equipment, technical rooms with reservoirs, and utilities.
Implementation Deadlines:
- Fieldwork – 20 days
- Data post-processing – 20 days
Haisyn Sugar Plant
Task
Creating a BIM model of the object to obtain dimensional drawings (for reconstruction) using laser 3D scanning.
Object Complexity
Lots of technological equipment, technical rooms with reservoirs, and utilities.
Implementation Deadlines:
- Fieldwork – 21 days
- Data post-processing – 22 days
"Svyato-Voskresensky Novo-Athos Monastery on Pekarska Street, 59A, in Lviv"
Task
Creating a BIM model of the object to obtain dimensional drawings (for reconstruction) using laser 3D scanning.
Object Complexity
Lots of vegetation, requiring multiple stations to be set up.
Implementation Deadlines:
- Fieldwork – 21 days
- Data post-processing – 22 days
330 kV Substation in Novovolynsk
Task
Creating a BIM model of the object to obtain dimensional drawings (for reconstruction) using laser 3D scanning.
Road P-47, Kherson–Nova Kakhovka–Henichesk
Exploration Objectives
Current average road maintenance.
Geodesy
Topographic survey at a scale of 1:500 (138 km), surveying of surface and underground utilities, measurement of diameters of water pipes and sagging of power cables.
Execution Term:
- fieldwork – 35 days;
- desk work – 30 days.
Road T-23-10, Holosiv–Derazhnia–Luka Barska
Exploration Objectives
Current average road maintenance.
Geodesy
Topographic survey at a scale of 1:1000 (41.376 km), surveying of surface and underground utilities, measurement of diameters of water pipes and sagging of power cables.
Execution Term:
- fieldwork – 14 days;
- desk work – 12 days.
Road T-13-07, Svatove - Novopskov - Milove
Exploration Objectives
Current average road maintenance.
Geodesy
Topographic survey at a scale of 1:1000 (24.6 km), surveying of surface and underground utilities, measurement of diameters of water pipes and sagging of power cables.
Execution Term:
- fieldwork – 9 days;
- desk work – 10 days.
Road R-37, Energodar-Vasylivka
Exploration Objectives
Current average road maintenance.
Geodesy
Topographic survey at a scale of 1:500 (34.4 km), surveying of surface and underground utilities, measurement of diameters of water pipes and sagging of power cables.
Execution Term:
- fieldwork – 10 days;
- desk work – 8 days.
Road H-14, Oleksandrivka-Kropyvnytskyi-Mykolaiv
Exploration Objectives
Current average road maintenance.
Geodesy
Topographic survey at a scale of 1:500 (15 km), surveying of surface and underground utilities, measurement of diameters of water pipes and sagging of power cables.
Execution Term:
- fieldwork – 5 days;
- desk work – 6 days.
Road O26080, Zalishchyky-Zvyniachyn-Horodenka
Search Goals
Current average road maintenance.
Geodesy
Topographic survey at a scale of 1:500 (9 km), surveying of surface and underground utilities, measurements of diameters of water conduits, and sagging of power cables.
Completion Time:
- Fieldwork – 4 days;
- Office work – 3 days.
Road P-33, Vinnytsia-Turbiv-Haisyn-Balta-Velyka Mykhailivka
Goals of the Survey
Performing current average road repairs.
Geodesy
Topographic survey at a scale of 1:1000 (17 km), surveying of surface and underground utilities, measuring the diameters of water conduits, and sagging of power lines.
Completion Time:
- Fieldwork – 6 days;
- Office work – 3 days.
Road H-07 "Kyiv-Sumy-Yunakivka"
Goals of the Survey
Current average road maintenance.
Geodesy
Topographic survey at a scale of 1:500 (20 km).
Duration:
- Field work – 7 days;
- Office work – 10 days.
Main water pipeline in Chernivtsi
Objectives of the survey:
Designing the reconstruction of a damaged section of the water pipeline.
Geodesy:
Topographic survey at scales of 1:500 and 1:5000 (42 km).
Термін виконання:
- Fieldwork – 24 days;
- Office work – 17 days.
"KES-UA Holding" LLC
Goals of the search:
Designing the construction of industrial, warehouse, auxiliary buildings, and structures.
Geodesy:
Topographic survey at a scale of 1:500 (11 hectares), coordination of the presence of engineering networks, marking of red lines.
Completion time:
- Fieldwork: 12 days;
- Office work: 12 days.
Residential complex 'Avalon' in Lviv
Goals of the survey:
Designing multi-story residential complexes.
Geodesy:
Topographic survey at a scale of 1:500 (1.72 hectares), approval of the presence of engineering networks, marking of red lines.
Completion time:
- Fieldwork – 10 days;
- Office work – 12 days.
Mykolaiv Cement Plant
Goals of the search:
Designing the reconstruction of the cement plant.
Geodesy:
Topographic survey at a scale of 1:500 (4.28 hectares).
Completion time:
- Fieldwork – 10 days;
- Desk work – 12 days.
"Arsen" supermarket in Lviv
Goals of search:
Designing the reconstruction of a supermarket.
Geodesy:
Topographic survey on a scale of 1:500 (5.9 hectares), approval of the presence of engineering networks, drawing red lines.
Completion time:
- Field work – 3 days;
- Chamber works – 4 days.
LLC "Epicenter K"
Goals of the Survey
Designing a shopping center.
Geodesy
Topographic survey at a scale of 1:500 (2.3 hectares), approval of the presence of engineering networks, marking of red lines.
Completion Time:
- Field work – 2 days;
- Office work – 2 days.
Gas station "ANP" in Sambir
Goals of the Survey
Designing a gas station.
Geodesy
Topographic survey at a scale of 1:500 (1.5 hectares), confirmation of the presence of engineering networks.
Completion Time:
- Field work – 1 day;
- Office work – 2 days.
Production and warehouse building in Maly Lyubin
Goals of the Survey
Designing the construction of a new industrial and warehouse building.
Geodesy
Topographic survey at a scale of 1:500 (3 hectares), confirmation of the presence of engineering networks, marking of red lines.
Completion Time:
- Field work – 1 day;
- Office work – 1 day.
Gas station "UPG" in Lviv
Goals of the Survey
To create an executive survey upon completion of construction.
Geodesy
Topographic survey at a scale of 1:500 (1.7 hectares), confirmation of the presence of engineering networks, marking of red lines.
Completion Time:
- Field work – 1 day;
- Office work – 2 days.
Galnaftogaz, Brody
Goals of the Survey
For construction permit.
Geodesy
Topographic survey at a scale of 1:500 (21 hectares), confirmation of the presence of engineering networks, marking of red lines.
Completion Time:
- Field work – 1 day;
- Office work – 3 days.
Galnaftogaz, Halych
Goals of the Survey
For construction permit.
Geodesy
Topographic survey at a scale of 1:500 (22 hectares), confirmation of the presence of engineering networks, marking of red lines.
Completion Time:
- Field work – 2 days;
- Office work – 4 days.
Galnaftogaz, Hrebinky
Goals of the Survey
For construction permit.
Geodesy
Topographic survey at a scale of 1:500 (20 hectares), confirmation of the presence of engineering networks, marking of red lines.
Completion Time:
- Field work – 2 days;
- Office work – 4 days.
Galnaftogaz, Lviv
Goals of the Survey
For construction permit.
Geodesy
Topographic survey at a scale of 1:500 (30 hectares), confirmation of the presence of engineering networks, marking of red lines.
Completion Time:
- Field work – 2 days;
- Office work – 3 days.
Galnaftogaz, Uzhhorod
Goals of the Survey
For construction permit.
Geodesy
Topographic survey at a scale of 1:500 (21 hectares), confirmation of the presence of engineering networks, marking of red lines.
Completion Time:
- Field work – 2 days;
- Office work – 4 days.
Oil pipelines Pechyvody
Goals of the Survey
For the reconstruction of the main oil pipeline “Druzhba”.
Geodesy
Topographic survey at a scale of 1:1000 (28 hectares).
Completion Time:
- Field work – 4 days;
- Office work – 5 days.
Oil pipelines Pylypovychi
Goals of the Survey
For the reconstruction of pipelines.
Geodesy
Topographic survey at a scale of 1:1000 (15 hectares).
Completion Time:
- Field work – 2 days;
- Office work – 4 days.
Recreation complex "Grand Resort"
Goals of the Survey
For creating the master plan of the “Grand Resort” recreational complex.
Geodesy
Topographic survey at a scale of 1:2000 (18 hectares).
Completion Time:
- Field work – 1 day;
- Office work – 2 days.
PJSC "NPP Interenergo"
Goals of the Survey
For the construction of a biogas plant with combined production of electric and thermal energy in Lviv.
Geodesy
Topographic survey at scales of 1:500 and 1:2000 (18 hectares).
Completion Time:
- Field work – 4 days;
- Office work – 5 days.
Road T-14-02 "Skhidnytsia - Pisochna"
Goals of the Survey
For the construction of the state-level highway T-14-02 “Skhidnytsia – Pisoschna”.
Geodesy
Topographic survey at a scale of 1:500 (5 km), coordination of engineering network availability, and marking of red lines.
Completion Time:
- Field work – 2 days;
- Office work – 2 days.
JSC "UKRNAFTOKHIMPROEKT"
Goals of the Survey
For comprehensive assessment of natural and man-made conditions of the construction area and for design, construction, and operation of facilities.
Geodesy
Topographic survey at a scale of 1:500 (20 hectares).
Completion Time:
- Field work – 2 days;
- Office work – 4 days.
Oil pipeline "Druzhba"
Goals of the Survey
For the reconstruction of the main oil pipeline “Druzhba,” including the relocation of pipeline sections across the Korchak River, Pechivody village, Slavutych district, Khmelnytskyi region.
Geodesy
Topographic survey at a scale of 1:1000 (28 hectares).
Completion Term:
- field work – 1 month;
- office work – 2 months.
Engineering and geodetic searches in the city of Lviv, str. Kukurudzyana
Goals of the Survey
To provide the project organization with initial data.
Geodesy
Topographic survey at a scale of 1:500 (1 hectare).
KNP "1st Territorial Medical Association of Lviv"
Goals of the Survey
For the reconstruction with further extension of the building of the Lviv City Territorial Medical Association No. 1.
Geodesy
Topographic survey at scales of 1:500 and 1:2000.
LLC "NORDIC-BUD"
Goals of the Survey
To provide the project organization with a topographic plan.
Geodesy
Topographic survey at a scale of 1:500 (5.5 hectares).
KST "Teploenergetik"
Goals of the Survey
To create a landscape design.
Geodesy
Topographic survey on a scale of 1:100 (0.371 ha).
«Substation 330kV «Rivne»
Goals of the Survey
Obtaining data to ensure territorial planning in the scope,
necessary for the development of the working project for the reconstruction of the 330 kV substation “Rivne” from
construction of protective structures of the main equipment, reception of the constructed ones
objects into operation.
Geodesy
Topographic survey on a scale of 1:200 (2 hectares).
Oil pipeline "Brody-Derzhkordon"
Goals of the Survey
To provide the project organization with a topographic plan for the purpose of dismantling the DN500 and DN700 oil pipelines at the Brody-Derzhkordon section km232-km286 of the Druzhba MN.
Geodesy
Topographic survey on a scale of 1:500 (214 hectares)
LLC "NORDIC-BUD"
Goals of the Survey
To ensure the project organization with a topographic plan for the arrangement of well No. 13 Rudnykivska with connection to the gas pipeline-loop from well No. 17 Rudnykivska (reconstruction) on the territory of Rozvadivska rural TG Stryi district of Lviv region.
Geodesy
Topographic survey on a scale of 1:500 (5.5 km).
Road R-47 "Kherson - Nova Kakhovka - Genichesk"
Targets of searches
Current average repair of the road.
Geology
The diameter of the road surface (138 km), drilling of wells, research of the soil-vegetation layer.
Performance period
- field work – 35 days;
- camera works – 30 days.
Road T-23-10 "Holosiv - Derazhnya - Luka Barska"
Targets of searches
Current average repair of the road.
Geology
The diameter of the road surface (41,376 km), drilling of wells, research of the soil-vegetation layer.
Performance period
- field work – 14 days;
- chamber works – 12 days.
Road T-13-07 "Svatove - Novopskov - Milove"
Targets of searches
Current average repair of the road.
Geology
The diameter of the road surface (24.6 km), drilling of wells, research of the soil-vegetation layer.
Performance period
- field work – 9 days;
- camera works – 10 days.
Road P-37 "Energodar-Vasylivka"
Targets of searches
Current average repair of the road.
Geology
The diameter of the road surface (32 km), drilling of wells, research of the soil-vegetation layer.
Performance period
- field work – 10 days;
- camera works – 8 days.
Road H-14 "Olexandrivka - Kropyvnytskyi - Mykolaiv"
Targets of searches
Current average repair of the road.
Geology
The diameter of the road surface (16 km), drilling of wells, research of the soil-vegetation layer.
Performance period
- field work – 5 days;
- camera works – 6 days.
Road О26080 "Zalishchiky - Zvynyachin - Horodenka"
Targets of searches
Current average repair of the road.
Geology
The diameter of the road surface (9 km), drilling of wells, research of the soil-vegetation layer.
Performance period
- field work – 4 days;
- camera works – 3 days.
Road P-33 "Vinnytsia - Turbiv - Haysyn - Balta - Velyka Mykhailivka"
Targets of searches
Current average repair of the road.
Geology
The diameter of the road surface (17 km), drilling of wells, research of the soil-vegetation layer.
Performance period
- field work – 6 days;
- camera works – 3 days.
Road H-07 "Kyiv- Sumy- Yunakivka"
Targets of searches
Current average repair of the road.
Geology
The diameter of the road surface (20 km), drilling of wells, research of the soil-vegetation layer.
Performance period
- field work – 7 days;
- camera works – 10 days.
Main water supply in Chernivtsi
Targets of searches
Designing the reconstruction of the emergency section of the water main.
Geology
Engineering and geological prospecting (165 m.p.).
Performance period
- field work – 24 days;
- camera works – 17 days.
TOV "KES-UA Holding"
Targets of searches
Designing the construction of production, warehouse, auxiliary buildings and structures.
Geology
Engineering and geological prospecting (224 m.p.).
Performance period
- field work – 12 days;
- chamber works – 12 days.
Residential complex "Avalon" in Lviv
Targets of searches
Design of multi-storey residential complexes.
Geology
Engineering and geological prospecting (160 m.p.).
Performance period
- field work – 10 days;
- chamber works – 12 days.
Mykolaiv Cement Plant
Targets of searches
Designing the reconstruction of a cement plant.
Geology
Engineering and geological prospecting (64 m.p.).
Performance period
- field work – 10 days;
- chamber works – 12 days.
Production and warehouse building in Maly Lyubin
Targets of searches
Designing the construction of a new production and warehouse building.
Geology
Engineering and geological prospecting (48 m.p.).
Performance period
- field work – 1 day;
- camera works – 1 day.
Galnaftogaz, Brody
Targets of searches
For a construction permit.
Geology
Engineering and geological prospecting – drilling with a drilling rig.
Performance period:
- field work – 1 day;
- camera works – 3 days.
Galnaftogaz, Halych
Targets of searches
For a construction permit.
Geology
Engineering and geological prospecting – drilling with a drilling rig.
Performance period:
- field work – 2 days;
- chamber works – 4 days.
Galnaftogaz, Hrebinky
Targets of searches
For a construction permit.
Geology
Engineering and geological prospecting – drilling with a drilling rig.
Performance period:
- field work – 2 days;
- chamber works – 4 days.
Galnaftogaz, Lviv
Targets of searches
For a construction permit.
Geology
Engineering and geological prospecting – drilling with a drilling rig.
Performance period:
- field work – 2 days;
- camera works – 3 days.
Galnaftogaz, Uzhhorod
Targets of searches
For a construction permit.
Geology
Engineering and geological prospecting – drilling with a drilling rig.
Performance period:
- field work – 2 days;
- chamber works – 4 days.
Oil pipelines Pechyvods
Targets of searches
For the reconstruction of the main oil pipeline “Druzhba”.
Geology
Engineering and geological prospecting – drilling with a drilling rig.
Performance period:
- field work – 4 days;
- camera works – 5 days.
PJSC "NPP Internergo"
Targets of searches
For the construction of a biogas plant with combined production of electricity and thermal energy in the city of Lviv.
Geology
Engineering and geological prospecting – drilling with a drilling rig.
Performance period:
- field work – 4 days;
- camera works – 5 days.
Road T-14-02 "Skhidnytsia - Pisochna"
Targets of searches
For the construction of the state highway T-14-02 “Skhidnytsia – Pisochna”.
Geology
Engineering and geological prospecting – drilling with a drilling rig.
Performance period:
- field work – 2 days;
- camera works – 2 days.
Oil pipelines Pylypovychi
Targets of searches
For the reconstruction of oil pipelines.
Geology
Engineering and geological prospecting – drilling with a drilling rig.
Performance period:
- field work – 2 days;
- chamber works – 4 days.
Housing construction in Khmelnytskyi
Targets of searches
For the construction of housing for internally displaced persons in the city of Khmelnytskyi.
Geology
Engineering and geological prospecting – drilling with a drilling rig.
Performance period:
- field work – 1 day;
- camera works – 10 days.
Search in the village Nizhnya Stynava, Stryi District, Lviv Region.
Targets of searches
For installing filters at a depth of 8 meters and 9 meters.
Geology
Engineering and geological prospecting – drilling with a drilling rig.
Performance period:
- field work – 4 days;
- camera works – 7 days.
Dental Implantation and Prosthetics Center on St. Pasichna, 22 in Lviv
Targets of searches
For the construction of a center for dental implantation and prosthetics.
Geology
Engineering and geological prospecting – drilling with a drilling rig.
Performance period:
- field work – 1 day;
- camera works – 10 days.
Podilsk Cement Plant
Targets of searches
For the construction of a structure and installation of selective non-catalytic reduction of nitrogen oxides in order to reduce emissions of nitrogen oxides during clinker firing at Podilsky Cement JSC.
Geology
Engineering and geological prospecting – drilling with a drilling rig.
Performance period:
- field work – 1 day;
- camera works – 10 days.