Completed work on geodesy

Road P-47, Kherson–Nova Kakhovka–Henichesk

Exploration Objectives

Current average road maintenance.

Geodesy

Topographic survey at a scale of 1:500 (138 km), surveying of surface and underground utilities, measurement of diameters of water pipes and sagging of power cables.

Execution Term:

  • fieldwork – 35 days;
  • desk work – 30 days.

Road T-23-10, Holosiv–Derazhnia–Luka Barska

Exploration Objectives

Current average road maintenance.

Geodesy

Topographic survey at a scale of 1:1000 (41.376 km), surveying of surface and underground utilities, measurement of diameters of water pipes and sagging of power cables.

Execution Term:

  • fieldwork – 14 days;
  • desk work – 12 days.

Road T-13-07, Svatove - Novopskov - Milove

Exploration Objectives

Current average road maintenance.

Geodesy

Topographic survey at a scale of 1:1000 (24.6 km), surveying of surface and underground utilities, measurement of diameters of water pipes and sagging of power cables.

Execution Term:

  • fieldwork – 9 days;
  • desk work – 10 days.

Road R-37, Energodar-Vasylivka

Exploration Objectives

Current average road maintenance.

Geodesy

Topographic survey at a scale of 1:500 (34.4 km), surveying of surface and underground utilities, measurement of diameters of water pipes and sagging of power cables.

Execution Term:

  • fieldwork – 10 days;
  • desk work – 8 days.

Road H-14, Oleksandrivka-Kropyvnytskyi-Mykolaiv

Exploration Objectives

Current average road maintenance.

Geodesy

Topographic survey at a scale of 1:500 (15 km), surveying of surface and underground utilities, measurement of diameters of water pipes and sagging of power cables.

Execution Term:

  • fieldwork – 5 days;
  • desk work – 6 days.

Road O26080, Zalishchyky-Zvyniachyn-Horodenka

Search Goals

Current average road maintenance.

Geodesy

Topographic survey at a scale of 1:500 (9 km), surveying of surface and underground utilities, measurements of diameters of water conduits, and sagging of power cables.

Completion Time:

  • Fieldwork – 4 days;
  • Office work – 3 days.

Road P-33, Vinnytsia-Turbiv-Haisyn-Balta-Velyka Mykhailivka

Goals of the Survey

Performing current average road repairs.

Geodesy

Topographic survey at a scale of 1:1000 (17 km), surveying of surface and underground utilities, measuring the diameters of water conduits, and sagging of power lines.

Completion Time:

  • Fieldwork – 6 days;
  • Office work – 3 days.

Road H-07 "Kyiv-Sumy-Yunakivka"

Goals of the Survey

Current average road maintenance.

Geodesy

Topographic survey at a scale of 1:500 (20 km).

Duration:

  • Field work – 7 days;
  • Office work – 10 days.

Main water pipeline in Chernivtsi

Objectives of the survey:

Designing the reconstruction of a damaged section of the water pipeline.

Geodesy:

Topographic survey at scales of 1:500 and 1:5000 (42 km).

Термін виконання:

  • Fieldwork – 24 days;
  • Office work – 17 days.

"KES-UA Holding" LLC

Goals of the search:

Designing the construction of industrial, warehouse, auxiliary buildings, and structures.

Geodesy:

Topographic survey at a scale of 1:500 (11 hectares), coordination of the presence of engineering networks, marking of red lines.

Completion time:

  • Fieldwork: 12 days;
  • Office work: 12 days.

Residential complex 'Avalon' in Lviv

Goals of the survey:

Designing multi-story residential complexes.

Geodesy:

Topographic survey at a scale of 1:500 (1.72 hectares), approval of the presence of engineering networks, marking of red lines.

Completion time:

  • Fieldwork – 10 days;
  • Office work – 12 days.

Mykolaiv Cement Plant

Goals of the search:

Designing the reconstruction of the cement plant.

Geodesy:

Topographic survey at a scale of 1:500 (4.28 hectares).

Completion time:

  • Fieldwork – 10 days;
  • Desk work – 12 days.

"Arsen" supermarket in Lviv

Goals of search:

Designing the reconstruction of a supermarket.

Geodesy:

Topographic survey on a scale of 1:500 (5.9 hectares), approval of the presence of engineering networks, drawing red lines.

Completion time:

  • Field work – 3 days;
  • Chamber works – 4 days.

LLC "Epicenter K"

Goals of the Survey

Designing a shopping center.

Geodesy

Topographic survey at a scale of 1:500 (2.3 hectares), approval of the presence of engineering networks, marking of red lines.

Completion Time:

  • Field work – 2 days;
  • Office work – 2 days.

Gas station "ANP" in Sambir

Goals of the Survey

Designing a gas station.

Geodesy

Topographic survey at a scale of 1:500 (1.5 hectares), confirmation of the presence of engineering networks.

Completion Time:

  • Field work – 1 day;
  • Office work – 2 days.

Production and warehouse building in Maly Lyubin

Goals of the Survey

Designing the construction of a new industrial and warehouse building.

Geodesy

Topographic survey at a scale of 1:500 (3 hectares), confirmation of the presence of engineering networks, marking of red lines.

Completion Time:

  • Field work – 1 day;
  • Office work – 1 day.

Gas station "UPG" in Lviv

Goals of the Survey

To create an executive survey upon completion of construction.

Geodesy

Topographic survey at a scale of 1:500 (1.7 hectares), confirmation of the presence of engineering networks, marking of red lines.

Completion Time:

  • Field work – 1 day;
  • Office work – 2 days.

Galnaftogaz, Brody

Goals of the Survey

For construction permit.

Geodesy

Topographic survey at a scale of 1:500 (21 hectares), confirmation of the presence of engineering networks, marking of red lines.

Completion Time:

  • Field work – 1 day;
  • Office work – 3 days.

Galnaftogaz, Halych

Goals of the Survey

For construction permit.

Geodesy

Topographic survey at a scale of 1:500 (22 hectares), confirmation of the presence of engineering networks, marking of red lines.

Completion Time:

  • Field work – 2 days;
  • Office work – 4 days.

Galnaftogaz, Hrebinky

Goals of the Survey

For construction permit.

Geodesy

Topographic survey at a scale of 1:500 (20 hectares), confirmation of the presence of engineering networks, marking of red lines.

Completion Time:

  • Field work – 2 days;
  • Office work – 4 days.

Galnaftogaz, Lviv

Goals of the Survey

For construction permit.

Geodesy

Topographic survey at a scale of 1:500 (30 hectares), confirmation of the presence of engineering networks, marking of red lines.

Completion Time:

  • Field work – 2 days;
  • Office work – 3 days.

Galnaftogaz, Uzhhorod

Goals of the Survey

For construction permit.

Geodesy

Topographic survey at a scale of 1:500 (21 hectares), confirmation of the presence of engineering networks, marking of red lines.

Completion Time:

  • Field work – 2 days;
  • Office work – 4 days.

Oil pipelines Pechyvody

Goals of the Survey

For the reconstruction of the main oil pipeline “Druzhba”.

Geodesy

Topographic survey at a scale of 1:1000 (28 hectares).

Completion Time:

  • Field work – 4 days;
  • Office work – 5 days.

Oil pipelines Pylypovychi

Goals of the Survey

For the reconstruction of pipelines.

Geodesy

Topographic survey at a scale of 1:1000 (15 hectares).

Completion Time:

  • Field work – 2 days;
  • Office work – 4 days.

Recreation complex "Grand Resort"

Goals of the Survey

For creating the master plan of the “Grand Resort” recreational complex.

Geodesy

Topographic survey at a scale of 1:2000 (18 hectares).

Completion Time:

  • Field work – 1 day;
  • Office work – 2 days.

PJSC "NPP Interenergo"

Goals of the Survey

For the construction of a biogas plant with combined production of electric and thermal energy in Lviv.

Geodesy

Topographic survey at scales of 1:500 and 1:2000 (18 hectares).

Completion Time:

  • Field work – 4 days;
  • Office work – 5 days.

Road T-14-02 "Skhidnytsia - Pisochna"

Goals of the Survey

For the construction of the state-level highway T-14-02 “Skhidnytsia – Pisoschna”.

Geodesy

Topographic survey at a scale of 1:500 (5 km), coordination of engineering network availability, and marking of red lines.

Completion Time:

  • Field work – 2 days;
  • Office work – 2 days.

JSC "UKRNAFTOKHIMPROEKT"

Goals of the Survey

For comprehensive assessment of natural and man-made conditions of the construction area and for design, construction, and operation of facilities.

Geodesy

Topographic survey at a scale of 1:500 (20 hectares).

Completion Time:

  • Field work – 2 days;
  • Office work – 4 days.

Oil pipeline "Druzhba"

Goals of the Survey

For the reconstruction of the main oil pipeline “Druzhba,” including the relocation of pipeline sections across the Korchak River, Pechivody village, Slavutych district, Khmelnytskyi region.

Geodesy

Topographic survey at a scale of 1:1000 (28 hectares).

Completion Term:

  • field work – 1 month;
  • office work – 2 months.

Engineering and geodetic searches in the city of Lviv, str. Kukurudzyana

Goals of the Survey

To provide the project organization with initial data.

Geodesy

Topographic survey at a scale of 1:500 (1 hectare).

KNP "1st Territorial Medical Association of Lviv"

Goals of the Survey

For the reconstruction with further extension of the building of the Lviv City Territorial Medical Association No. 1.

Geodesy

Topographic survey at scales of 1:500 and 1:2000.

LLC "NORDIC-BUD"

Goals of the Survey

To provide the project organization with a topographic plan.

Geodesy

Topographic survey at a scale of 1:500 (5.5 hectares).

KST "Teploenergetik"

Goals of the Survey

To create a landscape design.

Geodesy

Topographic survey on a scale of 1:100 (0.371 ha).

«Substation 330kV «Rivne»

Goals of the Survey

Obtaining data to ensure territorial planning in the scope,
necessary for the development of the working project for the reconstruction of the 330 kV substation “Rivne” from
construction of protective structures of the main equipment, reception of the constructed ones
objects into operation.

Geodesy

Topographic survey on a scale of 1:200 (2 hectares).

Oil pipeline "Brody-Derzhkordon"

Goals of the Survey

To provide the project organization with a topographic plan for the purpose of dismantling the DN500 and DN700 oil pipelines at the Brody-Derzhkordon section km232-km286 of the Druzhba MN.

Geodesy

Topographic survey on a scale of 1:500 (214 hectares)

LLC "NORDIC-BUD"

Goals of the Survey

To ensure the project organization with a topographic plan for the arrangement of well No. 13 Rudnykivska with connection to the gas pipeline-loop from well No. 17 Rudnykivska (reconstruction) on the territory of Rozvadivska rural TG Stryi district of Lviv region.

Geodesy

Topographic survey on a scale of 1:500 (5.5 km).