Completed works on geology
Road R-47 "Kherson - Nova Kakhovka - Genichesk"
Targets of searches
Current average repair of the road.
Geology
The diameter of the road surface (138 km), drilling of wells, research of the soil-vegetation layer.
Performance period
- field work – 35 days;
- camera works – 30 days.
Road T-23-10 "Holosiv - Derazhnya - Luka Barska"
Targets of searches
Current average repair of the road.
Geology
The diameter of the road surface (41,376 km), drilling of wells, research of the soil-vegetation layer.
Performance period
- field work – 14 days;
- chamber works – 12 days.
Road T-13-07 "Svatove - Novopskov - Milove"
Targets of searches
Current average repair of the road.
Geology
The diameter of the road surface (24.6 km), drilling of wells, research of the soil-vegetation layer.
Performance period
- field work – 9 days;
- camera works – 10 days.
Road P-37 "Energodar-Vasylivka"
Targets of searches
Current average repair of the road.
Geology
The diameter of the road surface (32 km), drilling of wells, research of the soil-vegetation layer.
Performance period
- field work – 10 days;
- camera works – 8 days.
Road H-14 "Olexandrivka - Kropyvnytskyi - Mykolaiv"
Targets of searches
Current average repair of the road.
Geology
The diameter of the road surface (16 km), drilling of wells, research of the soil-vegetation layer.
Performance period
- field work – 5 days;
- camera works – 6 days.
Road О26080 "Zalishchiky - Zvynyachin - Horodenka"
Targets of searches
Current average repair of the road.
Geology
The diameter of the road surface (9 km), drilling of wells, research of the soil-vegetation layer.
Performance period
- field work – 4 days;
- camera works – 3 days.
Road P-33 "Vinnytsia - Turbiv - Haysyn - Balta - Velyka Mykhailivka"
Targets of searches
Current average repair of the road.
Geology
The diameter of the road surface (17 km), drilling of wells, research of the soil-vegetation layer.
Performance period
- field work – 6 days;
- camera works – 3 days.
Road H-07 "Kyiv- Sumy- Yunakivka"
Targets of searches
Current average repair of the road.
Geology
The diameter of the road surface (20 km), drilling of wells, research of the soil-vegetation layer.
Performance period
- field work – 7 days;
- camera works – 10 days.
Main water supply in Chernivtsi
Targets of searches
Designing the reconstruction of the emergency section of the water main.
Geology
Engineering and geological prospecting (165 m.p.).
Performance period
- field work – 24 days;
- camera works – 17 days.
TOV "KES-UA Holding"
Targets of searches
Designing the construction of production, warehouse, auxiliary buildings and structures.
Geology
Engineering and geological prospecting (224 m.p.).
Performance period
- field work – 12 days;
- chamber works – 12 days.
Residential complex "Avalon" in Lviv
Targets of searches
Design of multi-storey residential complexes.
Geology
Engineering and geological prospecting (160 m.p.).
Performance period
- field work – 10 days;
- chamber works – 12 days.
Mykolaiv Cement Plant
Targets of searches
Designing the reconstruction of a cement plant.
Geology
Engineering and geological prospecting (64 m.p.).
Performance period
- field work – 10 days;
- chamber works – 12 days.
Production and warehouse building in Maly Lyubin
Targets of searches
Designing the construction of a new production and warehouse building.
Geology
Engineering and geological prospecting (48 m.p.).
Performance period
- field work – 1 day;
- camera works – 1 day.
Galnaftogaz, Brody
Targets of searches
For a construction permit.
Geology
Engineering and geological prospecting – drilling with a drilling rig.
Performance period:
- field work – 1 day;
- camera works – 3 days.
Galnaftogaz, Halych
Targets of searches
For a construction permit.
Geology
Engineering and geological prospecting – drilling with a drilling rig.
Performance period:
- field work – 2 days;
- chamber works – 4 days.
Galnaftogaz, Hrebinky
Targets of searches
For a construction permit.
Geology
Engineering and geological prospecting – drilling with a drilling rig.
Performance period:
- field work – 2 days;
- chamber works – 4 days.
Galnaftogaz, Lviv
Targets of searches
For a construction permit.
Geology
Engineering and geological prospecting – drilling with a drilling rig.
Performance period:
- field work – 2 days;
- camera works – 3 days.
Galnaftogaz, Uzhhorod
Targets of searches
For a construction permit.
Geology
Engineering and geological prospecting – drilling with a drilling rig.
Performance period:
- field work – 2 days;
- chamber works – 4 days.
Oil pipelines Pechyvods
Targets of searches
For the reconstruction of the main oil pipeline “Druzhba”.
Geology
Engineering and geological prospecting – drilling with a drilling rig.
Performance period:
- field work – 4 days;
- camera works – 5 days.
PJSC "NPP Internergo"
Targets of searches
For the construction of a biogas plant with combined production of electricity and thermal energy in the city of Lviv.
Geology
Engineering and geological prospecting – drilling with a drilling rig.
Performance period:
- field work – 4 days;
- camera works – 5 days.
Road T-14-02 "Skhidnytsia - Pisochna"
Targets of searches
For the construction of the state highway T-14-02 “Skhidnytsia – Pisochna”.
Geology
Engineering and geological prospecting – drilling with a drilling rig.
Performance period:
- field work – 2 days;
- camera works – 2 days.
Oil pipelines Pylypovychi
Targets of searches
For the reconstruction of oil pipelines.
Geology
Engineering and geological prospecting – drilling with a drilling rig.
Performance period:
- field work – 2 days;
- chamber works – 4 days.
Housing construction in Khmelnytskyi
Targets of searches
For the construction of housing for internally displaced persons in the city of Khmelnytskyi.
Geology
Engineering and geological prospecting – drilling with a drilling rig.
Performance period:
- field work – 1 day;
- camera works – 10 days.
Search in the village Nizhnya Stynava, Stryi District, Lviv Region.
Targets of searches
For installing filters at a depth of 8 meters and 9 meters.
Geology
Engineering and geological prospecting – drilling with a drilling rig.
Performance period:
- field work – 4 days;
- camera works – 7 days.
Dental Implantation and Prosthetics Center on St. Pasichna, 22 in Lviv
Targets of searches
For the construction of a center for dental implantation and prosthetics.
Geology
Engineering and geological prospecting – drilling with a drilling rig.
Performance period:
- field work – 1 day;
- camera works – 10 days.
Podilsk Cement Plant
Targets of searches
For the construction of a structure and installation of selective non-catalytic reduction of nitrogen oxides in order to reduce emissions of nitrogen oxides during clinker firing at Podilsky Cement JSC.
Geology
Engineering and geological prospecting – drilling with a drilling rig.
Performance period:
- field work – 1 day;
- camera works – 10 days.